Facility Interconnection Requirements (FIR) Large Load Template Download

Uncategorized

Please submit the following form to download the Facility Interconnection Requirements (FIR) for Large Computational Loads Connecting to the Bulk Power System Template. Your information will be used for internal follow-up regarding implementation of and future improvements to the Template.

After submitting this form, you will be redirected to download the PDF document. If you would prefer the template in Word format, please contact Eric Baran at ebaran@westernenergyboard.org.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Facility Interconnection Requirements (FIR) for Large Computational Loads Connecting to the Bulk Power System Template Download

Name*